Meet the TotaLite team at INTERGEO 2026 — Stuttgart, 6–8 October. Book a live sensor demo. Reserve a slot →

TotaLite Quick Installation Guide


Complete setup process — from unboxing to live displacement monitoring

 

PHASE 1: PREPARATION

Step 1 — Unbox & Verify Components

Check everything is present and undamaged before heading to site.

  • TotaLite Sensor + Shield
  • AC/DC Power Adapter (12V, 1.5A)
  • Power Splitter Cable
     

Step 2 — Create a Project in the TotaLite Platform 

Set up your monitoring project before going to site.

  • Obtain login credentials from the TotaLite team
  • Log in at app.totalite.io
  • Create a new project and assign your sensor to it

📖 Reference: TotaLite Platform


Step 3 — Download the TotaLite Mobile App 

Install the app on your phone before going to site.

📖 Reference: TotaLite App


PHASE 2: HARDWARE INSTALLATION

Step 4 — Mount the TotaLite Sensor 

The sensor must be installed rigidly — any translational movement invalidates measurements.

  • The TotaLite Sensor should be installed outside the zone of influence, on a rigid mount.
  • Minimise vibration and ensure zero translational movement and flex in the mounting.
  • When possible, avoid to mount the sensor with a pitch and/or roll angle of more than 20°.
  • If the sensor mounting sinks over the life of the project, it will hinder data quality.

📖 Reference: Sensor Installation


Step 5 — Install Survey Prisms 

Mount prisms firmly on the structures you want to monitor.

  • Minimum angular separation: 2° between targets
  • At 10 m → targets ≥ 0.35 m apart | At 50 m → ≥ 1.75 m apart
  • Drill into concrete for a stable, permanent connection
  • Face the prism center toward the TotaLite sensor
  • Max range: 70m
  • Record the slope distance from each prism to the sensor lens — you'll need these later

 

📖 Reference: Prism Installation


Step 6 — Connect Power 

Power up the sensor and shield using the supplied cable set.

  • Use the provided 12V adapter and power splitter cable
  • Connect both the sensor and shield M12 connectors at the back of the device
  • Accepted input: 9.5–24V DC, minimum 18W
  • Confirm status via LED indicators on the sensor

⚠️ Do not extend power cables beyond 3 m. Longer cables may cause voltage drop and unstable operation.

📖 Reference: Power Supply


PHASE 3: SENSOR CONFIGURATION

Step 7 — Connect the Mobile App to the Sensor 

Pair your phone via Bluetooth, then switch to the sensor's WiFi network.

  • Open the app, tap Sign In, enter your email, then tap Continue — you'll authenticate securely and land on your dashboard. Use the same credentials as your TotaLite Platform account. 
  • From the Home screen, tap "View Devices" to see all the devices linked to your account, then start the setup wizard for a specific device assigned to a project.
  • For documentation access, open the TotaLite User Guide under Quick Actions. Use the bottom navigation bar to move between Home, Devices, and Support.

📖 Reference: Sign-in


Step 8 — Configure App Wizard

  • Set up your project on the platform first. Your device needs to sit in a project with no baseline configured before the wizard will start. 
  • Budget 20 minutes on site. The wizard walks you through mounting, power, and target scanning — keep the line of sight clear during measurement. 
  • Check target separation before you leave. Targets flagged too close together need to be moved and re-measured, or excluded. 
  • Record slope distances on site. You'll need them for baseline setup back on the platform — that's where the installation actually finishes.

📖 Reference: Setting-up


PHASE 4: SYSTEM SETUP

Step 9 — Create a Baseline in the Platform 

The baseline is the reference point for all future displacement measurements.

  • Go to your project → click Create Baseline
  • Select the date/time for the baseline measurement
  • Name each target and enter its slope distance (sensor lens to prism center)
  • Mark 1 reference target for yaw compensation
  • Mark a 2nd reference target only if the sensor tilt (pitch/roll) exceeds 20°

📖 Reference: Create the Baseline 


Step 10 — Set Up Target Pairs (Optional) 

Required only if you need relative displacement measurements between two targets.

  • In the platform, drag a line between two targets to create a pair
  • Skip this step if only absolute displacement data is needed

📖 Reference: Create the Baseline › Target Pairs Setup


Step 11 — Set up Threshold Alerts

Set thresholds early.

  • Click Set Alerts on a displacement chart, and enter a value per target (1 mm–499 mm). Monitoring starts from that moment — nothing is backdated. 
  • Thresholds cover both directions. A 3 mm threshold alerts on displacement past +3 mm or −3 mm. 
  • Alerts trigger after 1 hour past threshold. Organisation admins get notified by email.
  • Check the 90-day status bar regularly. Green means no alerts; red means review it — click through to see which target, and when.

📖 Reference: Alerts

 

Step 12 — Final Verification & Quality Check 

Confirm the system is healthy and data is flowing before closing out the installation.

  • Confirm data connectivity: LTE or Ethernet active
  • Verify that measurements are appearing in the platform
  • Review data quality metrics: CQF > 70% and SNR > 18 dB
  • Contact the TotaLite team for a baseline quality assessment

📖 Reference: Advanced › Data Quality


System Ready for Monitoring Your TotaLite system is operational and collecting live displacement data.


Need support? Email: support@totalite.io Hours: 08:30–17:00 CET, Monday–Friday Documentation: totalite.notion.site/totalite-get-started

Was this article helpful?

0 out of 0 found this helpful